A Synergist company · Grid-scale energy storage

Electricity, carriedtothehouritmatters.

Storen develops, engineers and operates grid-scale battery storage — turning intermittent renewable generation into firm, dispatchable, revenue-generating capacity across Türkiye, Southeast Europe and Iberia.

Pipeline under development
0.0 GWh
Pipeline under development
Renewable delivery heritage
0 yrs
Renewable delivery heritage
Countries of operation
0
Countries of operation
Live · 50 MW / 100 MWh
18:36
100%
SOC
State of charge
Status
Idle
Power0.0 MW
Market price€116/MWh
0006121824

Illustrative dispatch profile

Built to institutional standard
EPDK licensingTEİAŞ grid connectionIEC 62933 · IEC 63056NFPA 855 fire safetyISO 9001 · ISO 45001Tier-1 LFP cell supplyLender technical diligenceIFC performance standardsEPDK licensingTEİAŞ grid connectionIEC 62933 · IEC 63056NFPA 855 fire safetyISO 9001 · ISO 45001Tier-1 LFP cell supplyLender technical diligenceIFC performance standards
The window

Türkiye has allocated 33 GW of storage-backed generation. Barely any of it is built.

In under three years, EPDK has issued pre-licences covering more than 33 GW of storage-integrated generation capacity — roughly 37 GWh of energy. Today, fewer than 500 MWh sit in commercial operation. The distance between an allocation on paper and steel in the ground is the largest execution gap in the region's energy transition. Storen exists to close it.

Allocation is not delivery. Delivery is the whole business.

Source: EPDK / Anadolu Agency Energy Terminal, 2025–2026.

33.1GW

Pre-licensed storage-integrated capacity

~37GWh

Allocated energy capacity

405MWh

Actually in commercial operation

One kilowatt-hour

Follow a single kilowatt-hour through one day.

Not a metaphor. This is the physical and commercial journey that every megawatt-hour in our portfolio makes, and the reason the asset earns anything at all.

Keep scrolling
11:50

Too much, too early.

At midday the sun delivers more than the grid can absorb. Prices sag, sometimes below zero. Without storage this energy is curtailed — switched off at the inverter and simply lost.

Local time
11:50
State of charge
0%
Market price
€21
Why Storen

Four commitments we underwrite in every contract.

01

Bankable from the first drawing

We develop to the standard a lender's technical adviser will apply, not the standard that gets to financial close fastest. Grid studies, geotechnical work, fire strategy and warranty structure are settled before we ask anyone for capital.

02

Technology-independent engineering

We do not manufacture and we are not tied to a supplier. Cells, PCS and EMS are selected against your dispatch profile, degradation tolerance and warranty appetite — then tendered competitively and held to the specification.

03

Revenue, not just megawatts

A battery earns from arbitrage, ancillary services and capacity — layered, not chosen. We model the stack at development stage and keep optimising it after commissioning, because that is where the last points of IRR live.

04

One accountable partner

Origination, permitting, engineering, EPC, commissioning and O&M under a single contract line. When something goes wrong at 03:00 on a Sunday, there is no interface to argue about.

Anatomy

What we actually build.

A storage plant is not a box of batteries. It is six systems that have to agree with each other, continuously, for twenty years.

MV collectionGenerationPCSBattery blocksEMS & optimiserGridACDC
Battery blocksLiquid-cooled LFP containers, BMS, fire detection and suppression.

Hover a node

Interactive · dispatch model

A day in the life of a storage asset.

Move the controls. Watch the asset decide when to buy and when to sell. This is the arithmetic underneath every investment case we underwrite — simplified, but not falsified.

Market priceChargingDischargingState of charge
03877115153€/MWh00040812162023
Hour of day
Energy capacity
100 MWh
Gross margin / day
€11k
Gross margin / year
€3.57M
Equivalent full cycles
340 / yr

Illustrative model. Single-cycle arbitrage only — no ancillary services, capacity payments, degradation, availability or charges included. Real underwriting uses site-specific price curves and a full revenue stack.

Solutions

From a single industrial roof to a 250 MW connection point.

Five delivery models, one engineering discipline behind all of them.

10 – 250 MW

Utility-scale BESS

Standalone, grid-connected storage sited against congestion, spread and connection availability. We take the asset from land control and pre-licence through to commercial operation.

  • Site origination & land control
  • EPDK pre-licence and licence
  • TEİAŞ connection agreement
  • Turnkey EPC and commissioning
Co-located

Hybrid renewables + storage

Solar or wind and storage sharing a single connection point. Higher capacity factor, curtailment recovered, and a materially better use of a scarce grid slot.

  • Curtailment recovery modelling
  • Shared connection optimisation
  • Retrofit into operating plants
  • Hybrid control philosophy
Behind the meter

Commercial & industrial

Storage placed behind an industrial meter to cut peak demand charges, arbitrage time-of-use tariffs and hold production through a grid event.

  • Peak shaving & demand charge management
  • Time-of-use arbitrage
  • Backup and ride-through
  • Self-consumption uplift for existing PV
Off-grid

Microgrids & islanded systems

Where the grid is weak, expensive or absent. Renewables, storage and controlled generation under one controller, sized against a real load profile rather than a nameplate.

  • Diesel displacement
  • Black-start and island operation
  • Remote sites and mining
  • Hybrid controller design
Owner's side

Advisory & technical diligence

Twelve years of owner's-engineer work carried into storage. Feasibility, technology selection, tender management, independent engineering and lender diligence support.

  • Feasibility & bankability review
  • Technology and supplier selection
  • Owner's engineer during EPC
  • Independent engineer reporting
Delivery model

Six stages. One accountable line.

Most storage projects fail between stages, not inside them. We hold the whole sequence.

Storen · General arrangementRev 01● Energised
Access roadN0200 mSite boundaryGrid connectionABCDE1234Battery arrayPCSMV switchgear
01Month 0 – 4

Origination & site control

Congestion analysis, land, access, and a connection point worth building on.

1 / 6
Pipeline

Where the portfolio stands.

A live view of what Storen is developing, building and operating. Detailed project data is available under NDA.

Konya OvasıKonya, TRSolar + BESS80 MW / 160 MWhPermitting
Tekirdağ Hat-2Tekirdağ, TRStandalone BESS50 MW / 100 MWhDevelopment
Bandırma RüzgârBalıkesir, TRWind + BESS120 MW / 240 MWhDevelopment
Aliağa Endüstriİzmir, TRC&I behind-the-meter12 MW / 24 MWhConstruction
Thessaly OneLarissa, GRSolar + BESS60 MW / 120 MWhDevelopment
Alentejo NorteÉvora, PTStandalone BESS45 MW / 90 MWhDevelopment

Illustrative portfolio structure. Project names, sizes and stages to be confirmed prior to publication.

Three markets, one team

Türkiye is the volume market. Greece and Portugal give the portfolio a second and third price signal — and a hedge against any single regulatory calendar.

İstanbul
Türkiye
HQ
Athens
Greece
Office
Lisbon
Portugal
Liaison
İstanbul
Athens
Lisbon
For investors

The case, stated plainly.

Storage is not a subsidy story. It is a volatility story — and volatility is the one thing the energy transition guarantees.

01

The revenue stack

Three layers, deliberately combined. Energy arbitrage takes the daily spread. Ancillary services — frequency response and reserve — pay for availability. Capacity mechanisms, where they exist, put a contracted floor under the merchant tail. Markets that start ancillary-led migrate to arbitrage-led as they saturate; an asset designed for only one of the three ages badly.

Energy arbitrageAncillary servicesCapacity payments
02

Structural scarcity of grid

Connection capacity, not land or equipment, is now the binding constraint. Every hybrid retrofit and every co-located battery extracts more energy from a connection point that already exists. That scarcity is what protects the asset's position for the next decade.

Connection-led sitingCurtailment recoveryHybrid retrofits
03

Cost curve and chemistry

LFP pricing and cycle life have moved the profitable-arbitrage threshold down year after year. We specify chemistry against the dispatch profile, secure cells with warranty terms that survive diligence, and structure augmentation into the model from day one rather than discovering it in year seven.

LFP · long cycle lifeAugmentation planningWarranty-backed degradation
04

Execution risk, priced honestly

The regional pipeline is enormous and the delivered base is tiny. That gap is where returns are made and lost. Our answer is unglamorous: fixed-price EPC where it belongs, contingency where it is real, no schedule we cannot defend line by line to an independent engineer.

Fixed-price EPCIE-ready documentationDefensible schedules
Heritage

Storen is the storage arm of Synergist.

Synergist has spent twelve years developing, managing and building photovoltaic projects across Türkiye, Greece and Portugal — consulting, project management, development and EPC, on the owner's side of the table. Storen carries the same people and the same discipline into the part of the system that decides whether all of that generation is worth anything at 19:00 on a still winter evening.

“1 + 1 > 2. Adding value to a project beyond what either party brings alone.”
Synergist, since 2013
Ethics
Experience
Quality
Research-led
Solution-focused
Teamwork
Questions

The ones we actually get asked.

  • Both. We develop and co-invest in our own portfolio, and we deliver for third-party owners as developer, EPC contractor or owner's engineer. The engineering standard does not change with the contract structure.

Next step

Every good storage project starts as a technical conversation.

Send us a connection point, a load profile or a pre-licence. We will tell you honestly whether it is worth building.