Solutions

From a single industrial roof to a 250 MW connection point.

Five delivery models, one engineering discipline behind all of them.

10 – 250 MW

Utility-scale BESS

Standalone, grid-connected storage sited against congestion, spread and connection availability. We take the asset from land control and pre-licence through to commercial operation.

  • Site origination & land control
  • EPDK pre-licence and licence
  • TEİAŞ connection agreement
  • Turnkey EPC and commissioning
Co-located

Hybrid renewables + storage

Solar or wind and storage sharing a single connection point. Higher capacity factor, curtailment recovered, and a materially better use of a scarce grid slot.

  • Curtailment recovery modelling
  • Shared connection optimisation
  • Retrofit into operating plants
  • Hybrid control philosophy
Behind the meter

Commercial & industrial

Storage placed behind an industrial meter to cut peak demand charges, arbitrage time-of-use tariffs and hold production through a grid event.

  • Peak shaving & demand charge management
  • Time-of-use arbitrage
  • Backup and ride-through
  • Self-consumption uplift for existing PV
Off-grid

Microgrids & islanded systems

Where the grid is weak, expensive or absent. Renewables, storage and controlled generation under one controller, sized against a real load profile rather than a nameplate.

  • Diesel displacement
  • Black-start and island operation
  • Remote sites and mining
  • Hybrid controller design
Owner's side

Advisory & technical diligence

Twelve years of owner's-engineer work carried into storage. Feasibility, technology selection, tender management, independent engineering and lender diligence support.

  • Feasibility & bankability review
  • Technology and supplier selection
  • Owner's engineer during EPC
  • Independent engineer reporting
Anatomy

What we actually build.

A storage plant is not a box of batteries. It is six systems that have to agree with each other, continuously, for twenty years.

MV collectionGenerationPCSBattery blocksEMS & optimiserGridACDC
Battery blocksLiquid-cooled LFP containers, BMS, fire detection and suppression.

Hover a node

Delivery model

Six stages. One accountable line.

Most storage projects fail between stages, not inside them. We hold the whole sequence.

Storen · General arrangementRev 01● Energised
Access roadN0200 mSite boundaryGrid connectionABCDE1234Battery arrayPCSMV switchgear
01Month 0 – 4

Origination & site control

Congestion analysis, land, access, and a connection point worth building on.

1 / 6
Questions

The ones we actually get asked.

  • Both. We develop and co-invest in our own portfolio, and we deliver for third-party owners as developer, EPC contractor or owner's engineer. The engineering standard does not change with the contract structure.

Next step

Every good storage project starts as a technical conversation.

Send us a connection point, a load profile or a pre-licence. We will tell you honestly whether it is worth building.