For investors

The case, stated plainly.

Storage is not a subsidy story. It is a volatility story — and volatility is the one thing the energy transition guarantees.

The window

Türkiye has allocated 33 GW of storage-backed generation. Barely any of it is built.

In under three years, EPDK has issued pre-licences covering more than 33 GW of storage-integrated generation capacity — roughly 37 GWh of energy. Today, fewer than 500 MWh sit in commercial operation. The distance between an allocation on paper and steel in the ground is the largest execution gap in the region's energy transition. Storen exists to close it.

Allocation is not delivery. Delivery is the whole business.

Source: EPDK / Anadolu Agency Energy Terminal, 2025–2026.

33.1GW

Pre-licensed storage-integrated capacity

~37GWh

Allocated energy capacity

405MWh

Actually in commercial operation

01

The revenue stack

Three layers, deliberately combined. Energy arbitrage takes the daily spread. Ancillary services — frequency response and reserve — pay for availability. Capacity mechanisms, where they exist, put a contracted floor under the merchant tail. Markets that start ancillary-led migrate to arbitrage-led as they saturate; an asset designed for only one of the three ages badly.

Energy arbitrageAncillary servicesCapacity payments
02

Structural scarcity of grid

Connection capacity, not land or equipment, is now the binding constraint. Every hybrid retrofit and every co-located battery extracts more energy from a connection point that already exists. That scarcity is what protects the asset's position for the next decade.

Connection-led sitingCurtailment recoveryHybrid retrofits
03

Cost curve and chemistry

LFP pricing and cycle life have moved the profitable-arbitrage threshold down year after year. We specify chemistry against the dispatch profile, secure cells with warranty terms that survive diligence, and structure augmentation into the model from day one rather than discovering it in year seven.

LFP · long cycle lifeAugmentation planningWarranty-backed degradation
04

Execution risk, priced honestly

The regional pipeline is enormous and the delivered base is tiny. That gap is where returns are made and lost. Our answer is unglamorous: fixed-price EPC where it belongs, contingency where it is real, no schedule we cannot defend line by line to an independent engineer.

Fixed-price EPCIE-ready documentationDefensible schedules
Governance

How we report

Institutional capital needs the same numbers, in the same format, on the same day of the month. That is a process problem, and we treat it as one.

Monthly asset reporting

Availability, round-trip efficiency, cycles, revenue by stream, and variance against model.

Independent verification

Capacity and RTE tests witnessed and reported by a third party at commissioning and annually.

Full data room

Permits, contracts, grid correspondence, technical reports and financial model, kept current — not assembled in a panic.

ESG & safety

IFC performance standards, NFPA 855 fire strategy, ISO 45001 site management, community engagement on record.

Interactive · dispatch model

A day in the life of a storage asset.

Move the controls. Watch the asset decide when to buy and when to sell. This is the arithmetic underneath every investment case we underwrite — simplified, but not falsified.

Market priceChargingDischargingState of charge
03877115153€/MWh00040812162023
Hour of day
Energy capacity
100 MWh
Gross margin / day
€11k
Gross margin / year
€3.57M
Equivalent full cycles
340 / yr

Illustrative model. Single-cycle arbitrage only — no ancillary services, capacity payments, degradation, availability or charges included. Real underwriting uses site-specific price curves and a full revenue stack.

Pipeline

Where the portfolio stands.

A live view of what Storen is developing, building and operating. Detailed project data is available under NDA.

Konya OvasıKonya, TRSolar + BESS80 MW / 160 MWhPermitting
Tekirdağ Hat-2Tekirdağ, TRStandalone BESS50 MW / 100 MWhDevelopment
Bandırma RüzgârBalıkesir, TRWind + BESS120 MW / 240 MWhDevelopment
Aliağa Endüstriİzmir, TRC&I behind-the-meter12 MW / 24 MWhConstruction
Thessaly OneLarissa, GRSolar + BESS60 MW / 120 MWhDevelopment
Alentejo NorteÉvora, PTStandalone BESS45 MW / 90 MWhDevelopment

Illustrative portfolio structure. Project names, sizes and stages to be confirmed prior to publication.

Three markets, one team

Türkiye is the volume market. Greece and Portugal give the portfolio a second and third price signal — and a hedge against any single regulatory calendar.

İstanbul
Türkiye
HQ
Athens
Greece
Office
Lisbon
Portugal
Liaison
İstanbul
Athens
Lisbon
Next step

Every good storage project starts as a technical conversation.

Send us a connection point, a load profile or a pre-licence. We will tell you honestly whether it is worth building.